however, there's still many obstacles which i am not going into details due to my inexperience
lucky enough my contractor is pretty easy going contractor. he is willing to guide me along the way
some detailed sketches i did for my own studies


pictures of the exact site during construction, the feeling of being able to be on site seeing people erecting design is awesome!
seeing my 2d drawings slowly becoming 3 dimensional is beyond words. the sense of fulfillment is just awesome
there are many spontaneous changes in the design such as not plastering the walls and etc
No comments:
Post a Comment